KEEP THE TOWN OF ISLIP SAFE

KEEP THE TOWN OF ISLIP SAFE KEEP THE TOWN OF ISLIP SAFE KEEP THE TOWN OF ISLIP SAFE
  • HOME
  • WHAT IS BESS?
  • KNOW THE RISKS
  • BESS INCIDENTS
  • VOICE YOUR OPPOSITION
  • NO RAPID ACT
  • CONTACT US
  • STAY INFORMED
  • More
    • HOME
    • WHAT IS BESS?
    • KNOW THE RISKS
    • BESS INCIDENTS
    • VOICE YOUR OPPOSITION
    • NO RAPID ACT
    • CONTACT US
    • STAY INFORMED

KEEP THE TOWN OF ISLIP SAFE

KEEP THE TOWN OF ISLIP SAFE KEEP THE TOWN OF ISLIP SAFE KEEP THE TOWN OF ISLIP SAFE
  • HOME
  • WHAT IS BESS?
  • KNOW THE RISKS
  • BESS INCIDENTS
  • VOICE YOUR OPPOSITION
  • NO RAPID ACT
  • CONTACT US
  • STAY INFORMED

BESS facilities bring dangerous risks

Electrical & Mechanical Risks

Environmental, Fire & Explosion Risks

Electrical & Mechanical Risks

  • Overcharging / overvoltage 
  • Over-discharging 
  • External short circuits / wiring faults / connector failures 
  • Internal short circuits (dendrites, separator failure) 
  • Ground faults / insulation breakdown 
  • Arc flash / high-energy discharge events 
  • Inverter / PCS failure 
  • Protection system failure / backfeed into grid
  • Impact / vibration / seismic damage 
  • Crushing, penetration, or deformation 
  • Structural failure (racks, containers) 
  • Transport damage / installation errors

Thermal Risks

Environmental, Fire & Explosion Risks

Electrical & Mechanical Risks

  • Overheating / hot spots 
  • Thermal runaway (cell → module → system) 
  • Cooling system failure (HVAC / liquid) 
  • High ambient temperature exposure 
  • External fire exposure 
  • Thermal gradients across modules

Environmental, Fire & Explosion Risks

Environmental, Fire & Explosion Risks

Toxic & Hazardous Emissions & Chemical Risk

  • Cell/module ignition 
  • Jet flames / torching / pool fires 
  • Gas deflagration or detonation (confined spaces) 
  • Fire spread between modules or containers 
  • Re-ignition after suppression
  • Air pollution (toxic gases, particulates) 
  • Soil and groundwater contamination 
  • Firefighting runoff contamination 
  • Hazardous waste generation / long-term site contamination

Toxic & Hazardous Emissions & Chemical Risk

System Level Risks & High Consequence / Low Frequency Risk

Toxic & Hazardous Emissions & Chemical Risk

  • Hydrogen fluoride (HF) 
  • Carbon monoxide (CO) 
  • Volatile organic compounds (VOCs) 
  • Hydrogen / methane release 
  • Oxygen depletion in confined spaces
  • Electrolyte decomposition or leakage 
  • SEI layer breakdown / lithium plating / dendrite growth 
  • Contamination during manufacturing 
  • Off-gassing (flammable/toxic gases)

Pressure, Gas, Aging & Degradation Risks

System Level Risks & High Consequence / Low Frequency Risk

System Level Risks & High Consequence / Low Frequency Risk

  • Gas buildup / vent failure 
  • Overpressure events 
  • Rupture of cells/modules 
  • Confined-space explosion
  • Capacity fade / increased internal resistance 
  • Higher likelihood of internal shorts 
  • Seal degradation → leakage 
  • End-of-life instability

System Level Risks & High Consequence / Low Frequency Risk

System Level Risks & High Consequence / Low Frequency Risk

System Level Risks & High Consequence / Low Frequency Risk

  •  Cascading failure (cell → module → rack → system) 
  • Containerized system hazards 
  • Detection system failure (gas, smoke, temperature) 
  • Fire suppression system failure 
  • BMS / software / control system failure 
  • Communication failures between subsystems 
  • Multi-container or facility-level explosion 
  • Grid instability or cascading outage 
  • Community evacuation 
  • Critical infrastructure damage

Human Safety & Emergency Response Risks

Installation, Design, External & Site Risks

Installation, Design, External & Site Risks

  • Electric shock / arc flash injuries 
  • Thermal burns / chemical burns (HF exposure) 
  • Blast injuries / projectiles 
  • Smoke / toxic gas inhalation 
  • Delayed hazard during overhaul (reignition) 
  • Fire suppression challenges 
  • High water demand / limited agent effectiveness 
  • Long-duration fires / re-ignition risk 
  • Extended monitoring or controlled burn requirement

Installation, Design, External & Site Risks

Installation, Design, External & Site Risks

Installation, Design, External & Site Risks

  • Improper system design / spacing / separation 
  • Poor ventilation / fire protection design 
  • Non-compliance with codes or standards 
  • Incorrect electrical configuration
  • Flooding / water ingress 
  • Earthquakes / lightning strikes 
  • Extreme temperatures 
  • Nearby fire exposure 
  • Proximity to populated areas or critical infrastructure

Operational, Logistics & Lifecycle Risks

Installation, Design, External & Site Risks

Operational, Logistics & Lifecycle Risks

  • Maintenance errors / sensor failures / calibration errors 
  • Overloading / misuse 
  • Data monitoring failures 
  • Manufacturing defects / counterfeit cells 
  • Damage during shipping / storage issues 
  • Decommissioning hazards / recycling or disposal risks

Additional Risks

Risk Amplifiers


  • High state of charge (SOC) 
  • High energy density / dense packing 
  • Poor thermal management 
  • Enclosed or containerized systems 
  • Lack of gas detection / inadequate venting 
  • Insufficient separation distances 

Stop BESS

Protect Our Community
Sign The Petition

Copyright © 2026 Stop BESS - All Rights Reserved.

  • HOME
  • WHAT IS BESS?
  • KNOW THE RISKS
  • BESS INCIDENTS
  • VOICE YOUR OPPOSITION
  • NO RAPID ACT
  • CONTACT US
  • STAY INFORMED

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept